We are making progress...


along...We are inspiring my sister...
not so much my sister's hubby:) Love
ya Bryan! So this is looking down the
stairs. There use to be a wall here
with a door going into this unfinished
area but the wall is down now. Steve
and his dad were able to move the outlet
that was on this wall and run the rest of
the electrical for Phase 2- HOWEVER phase
one is not done:) Disclaimer! The walls
are NOT blue- the picture makes them
look that way-just wanted you to know because
that would be super pretty!
bar stools over on this side of the
wall.
The last door (where the chair is at)
is to the storage room. The second door
is to the bathroom Phase 3 (my oh so
favorite part) and the third door is easy
access to the heater/furnace/hot water tank.
Originally the door to this was going to be
in the bathroom but then that would be one
more area to go through in the event it needed
to be replaced. With my luck if I would have
convinced Steve to do it that way the heater would
go out the week after the bathroom was finished and
we would probably have to knock out a wall or something
super fun like that so I think 3 doors will be just fine.
I will put signs above them to direct traffic:)
that is currently finished. I covered
everything because of the mess...see previous
post to see the dust I created!
opposite side of the basement. There
are a couple more sheets to do in here
and there will also be a window on that
wall- I know the fabric on the wall is
pretty trendy but it's gotsta goa!
there will be a closet along the wall
that runs underneath the stairs. We
are waiting to sheetrock the ceiling before
we build the frame for the closet. Maybe
next weekend??? So that is what we did
this weekend. Anyone up for a "Remove
popcorn ceiling Party?" Please RSVP to me:) LOL






1 Comments:
I'm totally there for the ceiling party - should I bring the margarita machine or the rolling cooler?
Post a Comment
Subscribe to Post Comments [Atom]
<< Home